Phase 1: Cinderhouse Setup Tasks
0. Validation & Pre-Commitment (Do this before spending money)
[ ]Test the Menu: Host a test-cook for 10-20 friends/family to prove you can manage the timing and quality of the smoked meats at a slightly larger scale.[ ]Scout Locations: Speak to organizers of local markets, food festivals, or pub landlords. Ensure they allow BBQ stalls and find out what their pitch fees and waiting lists look like.[ ]Ringfence the Budget: Set aside ~£4k for the DIY/Hybrid garage build and pledge not to exceed it. Don't overcapitalize Phase 1.[ ]Lock Down the Brand: Secure the "Cinderhouse" social media handles (Instagram/Facebook) and web domain before doing any public marketing.
1. Design & Planning
[ ]Draft 3x3m garage floorplan (showing sinks, tables, fridge, oven, hob, and side door access)[ ]Electrician Check: Have an electrician verify if the existing garage consumer unit/cable can handle the load of a 13-amp oven + induction hob + water heater simultaneously.[ ]Source quotes/links for specific water tank systems (e.g., Flojet) vs Mains plumbing[ ]Source quotes/links for 13-amp plug-in convection oven & portable induction hob[ ]Source quotes/links for knee-operated handwash basin & double prep sink[ ]Source quotes/links for PVC hygiene cladding
2. EHO & Compliance Preparation
[ ]Draft HACCP section: Cross-contamination prevention (Indoor/Outdoor flow)[ ]Draft HACCP section: Rapid cooling procedure for large meat joints[ ]Draft HACCP section: Water tank sanitization schedule[ ]Download/Print FSA "Safer Food, Better Business" pack[ ]Register food business with local council (28 days before trading)
3. Physical Build (Garage)
[ ]Clear out a 3x3m footprint in the Edwardian garage[ ]Erect stud partition wall & insulate[ ]Install PVC cladding on walls (or hire pro for plastering)[ ]Lay heavy-duty vinyl/epoxy flooring[ ]First fix electricals & upgrade consumer unit if needed (Electrician)[ ]Install side door fly screen curtain & electronic fly killer (EFK)
4. Equipment Fit-Out
[ ]Install sinks and connect plumbing (Tanks or Mains)[ ]Move in fridges, prep tables, oven, and hob[ ]Second fix electricals and lighting (Electrician)[ ]Install high-powered domestic extractor hood (vented outside)
5. Final Launch Steps
[ ]Deep clean and sanitize all surfaces[ ]Host EHO inspection[ ]First test-smoke batch!